HANDRAILS
04 MIN READ
Start with the building, not with a catalogue photo
Stairs, landings, balconies, ramps and mezzanines all ask different things of a rail. Occupancy, drop, whether children use the space, and whether the rail is a barrier or a handrail-only all change the design. We fabricate stainless handrails, balustrades and stair rails — but we do not invent the compliance path. That sits with your designer or certifier under the National Construction Code and the relevant Australian Standards.
What we do is build the metal so that the specified heights, infill and loads can actually be achieved: posts that are thick enough, welds that are structural, base plates that can take the bolts the engineer wrote, and infill that does not rattle.
If you arrive with “something like the rail at the last job”, bring a photo and the stair drawing. We will turn that into a fabricatable set. If you arrive with a full specification, we will build to it.
Stainless is the default for a reason
Hands will be on this metal every day. Painted steel chips. Timber needs maintenance. Stainless, specified correctly, takes weather, cleaning and grip. Interior commercial stairs often sit happily on 304. External, coastal or pool-adjacent rails usually want 316 and a finish that can be maintained.
Stair rails need continuous, comfortable grip and returns that do not catch clothing. Balustrades add infill: vertical bars, rails, or other specified infill. Glass, if it is part of the system, is a coordination item with the glazier; we build the metal that holds it, not the pane.
Welds on a handrail are in the user’s palm. They have to be dressed. A structural weld that is left proud is a complaint waiting for opening night. This is slow, skilled finishing, and it is in the price because it is in the product.
Fixings, cores and the edge of the slab
Most rail failures are fixing failures: undersized chemical anchors, plates sitting on a crumbling nosing, posts packed with washers because the set-out was hopeful. We want the structural substrate known before we drill. Core locations, cover to reinforcement and whether we are into steel, concrete or masonry all belong in the briefing.
Side-mount, top-mount and fascia-mount each change the look and the load path. Choose it with the architect, not with whoever has a hammer on the day. We can make all three. We cannot make a fascia mount look like a top mount after the stone is on.
Installation is where rails become real. Our installation crew will set posts, check line and close joints. If the stair is still a carcass, say so — we may template and come back rather than guess a finished nosing that does not exist yet.
Briefing the workshop
Send plans, sections and a note on interior versus exterior. If a certifier has already marked heights and infill, include that sheet. If there is an existing rail to match, we need a site measure; photographs alone will not get the centreline.
Lead time follows complexity: a straight corridor rail is not a helical stair. Do not compress the finishing stage. That is the part people touch.
Handrails and balustrades are a dedicated service in our range, sitting beside architectural metalwork and on-site welding. Use the service page for the product breakdown, and this note to get the specification out of the realm of “stainless rail, please”.
TAKE INTO THE BRIEF
- 01
COMPLIANCE IS DESIGNED, THEN BUILT
Heights, infill and loads come from the NCC and your certifier. We fabricate the metal so those numbers are real.
- 02
DRESS EVERY WELD
Rails are handled. Proud welds and mismatched grain are not a “workshop character” — they are defects.
- 03
KNOW THE SUBSTRATE
Top, side or fascia mount, and what we are bolting into, decide the job as much as the tube size.